Balboa GL2001 mach 3 Control - Box 7
-
Free shipping from €40,- for NL/BE/DE
All parts are shipped within 2-3 business days. Delivery time 3-5 business days.
Why Finesse Wellness?
- Free shipping from €40 for the Netherlands/Belgium/Germany
- Shipping costs to other countries from €40 are €9.99
- Not all parts are at our showroom location, so if you would like to pick up, please contact us first.
- Customers rate us with a 9.8!
- Available 7 days a week on: 038-781 0000 for advice and questions.
Balboa GL2001 mach 3 Control - Box 7
Balboa Electronic Control Panel
Specifications
- Product Type: Balboa Electronic Control Panel
- Manufacturer: Balboa
- Voltage: 230 V AC
- Frequency: 50 Hz
Connections:
- Pump 1: Single or two-speed pump + circulation pump (if required)
- Pump 2: Single or dual speed
- Pump 3 or blower: Single speed
- Heating: x 1 (3 KW)
- Ozone: x 1
- Lighting: x 1, 12 volt or 230 volt (depending on requirements)
- Radio, TV/AV: Connection point available
Compatible with
- Systems equipped with control panels from the advanced ML series, such as the ML700 and ML900
- Suitable for upgrades
- Master Spas and Spaform Prestige Series spas
- Replaces Master Spa MS5000E 55062 or 55063
Features
- M7 technology: sensors and flow switches are unnecessary, everything is controlled internally in the control unit by 2 sensors
- Versatile: Works with multiple control panels and auxiliary buttons
Warning
- This is a universal unlicensed control panel.
- Installation by a qualified person or professional is required.
- Incorrect installation may void the warranty.
Netherlands/Belgium/Germany
Orders of Accessories, Filters and Cleaning products are shipped free of charge from €40 within the Netherlands/Belgium/Germany. For orders up to €40 we charge €5.95.
The rest of Europe
Orders of Accessories, Filters and Cleaning products from €40 will be shipped for €9.99. For orders up to €40 we charge €13.99.
Completed orders that we before 2:00 PM Received orders will be shipped within 24 hours, usually delivered the next working day within the Netherlands.
Destination | Transit time (number of working days) |
Belgium | 1-2 |
Germany | 1-2 |
France (incl. Monaco and Corsica; excl. Gibraltar and Channel Islands) | 2-3 |
Italy (excluding San Marino and Vatican City) | 3-6 |
Luxembourg | 1-2 |
Austria | 3-4 |
Poland | 3-4 |
Portugal (including Azores and Madeira) | 3-5 |
Spain (including Balearic Islands; excl. Canary Islands) | 3-5 |